Located in Binbrook, Ontario.
Designed for HWCDSB based on Holy Name of Jesus CES and Our Lady of Assumption CES. Replacement school with 15 classrooms, 4 kindergarten rooms, 1 special education room, and a Child Care Centre with 3 activity rooms. Capacity 450 pupils with a future 6‑pack addition. Includes a gym with pull‑out bleachers, a central stage that doubles as a classroom, and under‑stage dollies for table/chair storage. High vaulted lobby with clerestory windows for natural light and an oversized entrance lobby for gatherings and bus staging in bad weather.
Located in Rockton, Ontario.
Design for HWDSB and City of Hamilton: a one‑storey rural school with a 4,500 sq ft community centre via a joint development/construction agreement. Shared common entrance—community centre left, school right. School capacity 488; gym shared with the community centre. Site includes stormwater bioretention, MOECC‑approved on‑site sanitary system with biofilter and dispersal bed, potable water from existing well, and underground water storage for sprinklers.
Located in Glanbrook, Ontario.
The HWCDSB school follows our Holy Name of Jesus CES design. HNJCES is a 450‑pupil replacement school with 15 classrooms, 4 kindergarten rooms, 1 special‑education space, and a Child Care Centre with 3 activity rooms. Features include a gym with pull‑out bleachers and a center stage that doubles as a classroom, under‑stage dollies for table/chair storage, and a vaulted main lobby with clerestory windows and an oversized entrance for gatherings.
Located in Stoney Creek, Ontario.
This one‑storey replacement for the 60‑year‑old IHMCES houses 17 classrooms (including 1 Special Education and 3 Kindergarten), designed for 500 pupils. The kindergarten wing adjoins a three‑activity Early Years Child Care Centre for easy integration. A large double gym with raised stage can serve as a temporary classroom. The original school's terrazzo logo was salvaged and installed in the high‑vaulted lobby.
Located in Waterdown, Ontario.
The HWDSB replacement school has 24 classrooms, 1 Special Education room, and 5 Kindergarten rooms for the all-day program, serving 650 pupils. It includes a dividable double gym with raised stage and under-stage storage for tables and chairs. Polished concrete floors in main corridors, washrooms, and lobby create a consistent flow. The lobby features a sunken pit for presentations and small gatherings. After completion, the old school was demolished for a new soccer playfield.
Located in Hamilton, Ontario.
The replacement school for HWCDSB seats 450 with 15 classrooms, 4 kindergarten rooms, and 1 special education room. The design includes a three-activity daycare and a community breakfast space off the main lobby. A two-storey vaulted lobby admits ample north-facing light. A thermal wall was added to the mechanical penthouse exterior.
Located in Mississauga, Ontario.
Prototype senior elementary school for Peel District School Board, repeated at eight Mississauga sites. Combined one- and two-storey building with double gym and raised stage. Capacity 700 pupils; GFA 6,250 m². Expandable with removable modular single‑storey classroom additions along one side. Used for Ruth Thompson, Thomas Street, Allan Drive and McCimmon Middle Schools.
Located in Burlington, Ontario.
We provided programming, architectural, and engineering services from schematic design through construction administration, and prepared the site plan approval application. Using a 2‑hour firewall and showing buildings face two streets, we avoided sprinklering the entire existing building. The addition includes a new gym, offices, and washrooms; the small existing gym became a Learning Commons. We also added a new front entrance from the parking area. The main challenge was the multilevel, century‑old school with multiple additions; adding an elevator in the new wing achieved barrier‑free access to all levels.
In final design, this 5,181 sm, two‑storey elementary school includes 17 classrooms, 4 kindergarten rooms, a large gym with pull‑out bleachers and a staged storage system, plus a three‑activity daycare for 49 children. Projects for BHNCDSB in Brantford and Paris, Ontario, target occupancy in early–mid 2028.
Located in Paris, Ontario.
The school had two additions constructed simultaneously at each end of the school while being fully occupied during the school year. A 525sm one-storey three activity room 64 child capacity Daycare addition. With a separate playground and parking for the daycare addition. On the other side of the school, we designed a two-storey 8-classroom addition that complemented the existing two-storey school, adding 591sm to the existing school.
Located in Welland, Ontario.
The two‑storey addition adds 16 classrooms and a large double gym with changerooms and washrooms, designed for after‑hours community use. The new classrooms accommodate 350 more students, raising capacity to 735. The existing gym is renovated into a 3‑activity Room Daycare with adjacent outdoor play area and full childcare amenities (laundry, kitchen, storage, staff office and lunchroom). School infrastructure will be upgraded to support the addition. Sprinkler line installation will be phased over summer break to avoid disrupting occupancy. The library has been renovated into a large activity space with new lighting; all corridors will receive new ACT and LED lighting.
Located in Waterloo, Ontario.
Completed in two phases. Phase One: converted two classrooms to FDK. Phase Two: added eight classrooms, washrooms, site modifications, recycling stations and playground. An open courtyard provides natural light and serves as an outdoor classroom. Design matches existing finishes. To minimize disruption, construction was phased with summer interior work; a main sprinkler line and electrical conduits were extended through the corridor to the addition. An interior classroom was converted to washrooms so all classrooms have exterior windows.